Tuesday, March 20, 2018

Port of LA Land Approved for SpaceX Manufacturing Facility.

SpaceX's first BFR manufacturing facility approved by the Port of LA

SpaceX has been given initial approval by the Port of Los Angeles to acquire and develop a massive vacant lot into a facility capable of manufacturing the first BFR prototypes and refurbishing the company's reusable Falcon 9 boosters. This approval is without a doubt the biggest step forward yet for the company's ultimate goal of ... 

From article, (SpaceX has been given initial approval by the Port of Los Angeles to acquire and develop a massive vacant lot into a facility capable of manufacturing the first BFR prototypes and refurbishing the company’s reusable Falcon 9 boosters. This approval is without a doubt the biggest step forward yet for the company’s ultimate goal of sending massive spaceships to Mars.

A request summary completed on March 6 details SpaceX’s proposal, laying out a bright future of rocket manufacturing for the abandoned 18-acre lot at Berth 240, one that might soon support “composite curing, cleaning, painting, and assembly [of commercial transportation vessels]” that “would need to be transported by water due to their size.” This description meshes almost perfectly with past discussion of BFR manufacturing plans from SpaceX executives like Elon Musk and Gwynne Shotwell, both of which have in the recent past affirmed the need for any BFR manufacturing facility to be located adjacent to a large body of water due to the difficulty of transporting rocket hardware as large as BFR.

 On March 15, around a week after the environmental impact assessment gave a green light for SpaceX’s facility, Port of Los Angeles’ Board of Harbor Commissioners approved the proposal, effectively giving SpaceX permission to begin serious demolition and construction activities at Berth 240, an abandoned lot located on the San Pedro side of the greater Port of Los Angeles, which refers to both Ports of San Pedro and Long Beach. To provide context, SpaceX’s primary manufacturing facilities in Hawthorne, CA occupy 10-15 acres of urban real estate – in other words, even partial development of Berth 240’s 18 acres would mark a huge expansion of the company’s available manufacturing and refurbishment space, an absolute necessity for the construction of a launch vehicle as large as BFR.

The construction of such a facility would make it significantly easier for SpaceX to build its first BFR/BFS prototypes, avoiding the massive disruption and cost that transporting the 9m-diameter vehicle through downtown LA. Rather than dealing with that nightmare, SpaceX would instead be able to simply crane an assembled booster or spaceship onto a barge (perhaps a drone ship?) that would then ship the rocket hardware through the Panama Canal to the company’s facilities in Cape Canaveral, FL or Boca Chica, TX.

While it is likely to take a fair amount of time to prepare the lot for the construction of a facility capable of manufacturing advanced composite rocket components, the wording in the Port documentation also suggests that SpaceX means to transfer its Falcon 9 recovery work to the new berth as soon as it’s available. Indeed, the comparatively massive space would give SpaceX far more room for recovery operations with the drone ship Just Read The Instructions (JRTI), and could potentially become a one-stop-shop for booster recovery and refurbishment. As of now, boosters recovered on the West Coast are transported to the Hawthorne factory for all refurbishment work, operations that themselves already require brief road stoppages to accommodate the sheer size of Falcon 9. As of 2018, SpaceX is planning for BFR to be 50% taller and close to three times as wide as Falcon 9 (350 feet long and 30 feet in diameter).

For More Info

Tesla Closing In On 2,000 Model 3's Produced a Week.

Tesla Model 3 production is significantly accelerating based on new VINs

It remains difficult to determine Tesla's current Model 3 production rate. This data is highly important at many different levels to reservation holders and the industry in general as the biggest electric vehicle production program in the world.
From article, (It remains difficult to determine Tesla’s current Model 3 production rate. This data is highly important at many different levels to reservation holders and the industry in general as the biggest electric vehicle production program in the world.

Analysts are not optimistic about the company reaching its goal, but the automaker has been increasingly registering new VINs for Model 3 lately – indicating that the production could be nearing 2,000 units per week.

As we previously discussed on several occasions, looking at the total of vehicle identification numbers (VINs) is not a great way to track a production ramp-up at Tesla because previous production programs showed that the automaker skips numbers.

Therefore, the fact that Tesla has registered Model 3 VINs over #15,000 doesn’t mean that the company has produced nearly as many vehicles.

But if the rate at which Tesla is registering new Model 3 VINs is accelerating, that’s a pretty good indication that production is also increasing.

After the company started taking orders from non-Tesla owners last month, new VINs were rare, but it picked up in March with Tesla registering about 1,000 new VINs per week and today it registered over 2,000 more VINs.

4,500 new Model 3 VINs registered by Tesla in the first 3 weeks of March.
The company has been targeting a production rate of 2,500 Model 3 vehicles per week by the end of March and while it doesn’t seem to be there yet, it’s getting a lot closer to 2,000 units per week.)